Tenaga Pendamping PKPD dari Disnakertrans DIY 2025

Project Report - Kab. Bantul (2025)

Administrative & Monitoring Support

Kabupaten Bantul (2025)

Logo Program
Program Village Potential Labor-Intensive
Agency Disnakertrans DIY
Scope 3 Villages in Kab. Bantul

Project Overview

This post serves as a comprehensive report of my role as a Field Assistant for the Village Potential Labor-Intensive Program within the Kabupaten Bantul region. Managing 8 projects simultaneously in one regency required strategic scheduling and consistent communication between various village governments and the provincial office of Disnakertrans DIY.

My primary objective was to ensure that each village met the strict administrative and technical standards required for government-funded infrastructure projects.


Project Locations in Kab. Bantul

During this period, I provided end-to-end monitoring and administrative assistance for the following 3 villages:

No. Village (Desa) Project Category Status
1 Padukuhan Sendangsari, Terong, Dlingo, Bantul Road Construction 100% Completed
2 Pinus Pengger, Terong, Dlingo, Bantul Road Construction 100% Completed
3 Wisata Hutan Pengger, Terong, Dlingo, Bantul Talud Construction 100% Completed

Core Responsibilities

Managing a regional cluster of 3 villages involved:

  • Synchronized Monitoring: Scheduling regular site visits across Kab.Bantul to verify physical progress and labor attendance.
  • Unified Admin Support: Assisting 8 different village teams in preparing their initial documentation and budget proposals.
  • Quality Assurance: Verifying that all field activities adhered to technical guidelines.
  • Final Reporting (SPJ): Supervising the collection of receipts, photos, and reports to ensure accountability.

Key Outcomes & Achievements

  • High Efficiency: Successfully coordinated administrative submissions ensuring no delays in budget liquidation.
  • Data Accuracy: Maintained detailed digital and physical records for audits and evaluations.
  • Local Coordination: Built strong working relationships with village officials to ensure transparency.

Tools & Competencies

  • Regional Project Management: Balancing multiple on-site and administrative deadlines.
  • Documentation: High-volume data management using MS Excel and field monitoring tools. Systematic photo-tagging for progress evidence.
  • Liaison Excellence: Navigating bureaucratic processes between village levels and the DIY provincial government.
Project Notes: Managing these 8 locations in Kab.Bantul has sharpened my ability to handle large-scale administrative workloads while maintaining strict attention to detail in the field. This regional focus demonstrates my capacity for high-mobility coordination.

Project Documentation by Location

Below is the visual progress and administrative verification for each site in Kabupaten Bantul.

01 Padukuhan Sendangsari, Terong, Dlingo

Site Inspection

Site Inspection & Physical Progress

Admin Documents

Administrative Data Verification

02 Pinus Pengger, Terong, Dlingo

Labor Monitoring

Labor Monitoring Session

Final Report

Final Report Preparation

03 Wisata Hutan Pengger, Terong, Dlingo

Labor Monitoring

Labor Monitoring Session

Final Report

Final Report Preparation

Labels: Administrative Support · Field Monitoring · Disnakertrans DIY

Tidak ada komentar:

Posting Komentar

Pages